mon12junAll Daytue13Traffic Interruptions Expected(All Day)(GMT-04:00)
CPE will be back in to install bituminous curb on Church St. near 7-Eleven, Water St., Lower Main and will also perform pavement patching at two locations on Church St.
CPE will be back in to install bituminous curb on Church St. near 7-Eleven, Water St., Lower Main and will also perform pavement patching at two locations on Church St. There will be minor traffic interruptions and one lane will remain open during the work. The areas of work will be coned off for short periods of time.
June 12, 2023 - June 13, 2023 (All Day)(GMT-04:00)