BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//eventon.com NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
UID:6a14bcae730fd
DTSTAMP:20260525T211838Z
DTSTART:20230612
DTEND:20230613
LOCATION:
SUMMARY:Traffic Interruptions Expected
DESCRIPTION:CPE will be back in to install bituminous curb on Church St. ne
 ar 7-Eleven\,  Water St.\,  Lower Main and will also perform pavement patch
 ing at two locations on Church St. There will be minor traffic interruption
 s and one lane will remain open during the work. The areas of work will[..]
 \nhttps://newwindsormd.gov/events/traffic-interruptions-expected/
URL:https://newwindsormd.gov/events/traffic-interruptions-expected/
END:VEVENT
END:VCALENDAR